Solar panels on a Goan tiled roof
  1. Home
  2. GRK Energy
  3. Rooftop Solar

GRK Energy · Rooftop Solar

Make your own power. Sell back the rest.

Rooftop solar designed around your bill, installed by our own team, and backed by the government subsidy. We handle the paperwork, you keep the savings.

₹78,000Central subsidy for homes, plus Goa state subsidy
Any sizeResidential and commercial installations
Net meteringExport your surplus to the grid
ColvaService team minutes away

Three ways to go solar

The right system depends on what you want it to do.

PanelsInverterHomeGridNet meter
Most homes

On grid

Panels feed your home first and send the surplus to the grid through a net meter, so your bill drops month after month. No batteries, lowest cost, and eligible for the subsidy.

Switches off during a power cut, as the safety rules require.

PanelsSolar PCUHomeBattery
Long power cuts

Off grid

Panels charge a battery bank through a solar PCU or solar home UPS, so your essentials run through outages on stored sunshine.

Suits farms, remote homes and areas with frequent cuts.

PanelsHybrid inverterHomeGridNet meterBattery
Both worlds

Hybrid

Net metering by day and battery backup at night or during cuts. The most complete system, sized around what must stay on.

Higher cost, highest independence.

Savings calculator

What would solar save you?

Move the slider to your average monthly bill. Adjust the rate per unit if you know it from your bill. The estimate assumes an on grid home system and counts only the central subsidy; Goa's state subsidy comes on top.

₹3,000
₹500₹1,00,000
₹
Suggested system
6 kW
Central subsidy
₹78,000
Saving each year
₹36,000
Pays for itself in
10.3 years
Approximate cost
₹4,50,000
After central subsidy
₹3,72,000
Roof space needed
600 sq ft
CO₂ avoided each year
6.8 tonnes

Estimate based on 667 units a month. Central subsidy for homes under PM Surya Ghar: ₹30,000 per kW for the first 2 kW, ₹18,000 for the third, capped at ₹78,000. Goa adds its own state subsidy from April 2026, which lowers the cost further; we confirm the exact amount at your free site survey.

From survey to switch on

Six steps. One team from start to finish.

  1. Step 01

    Free site survey

    We check your roof, shade, structure and your last few bills.

  2. Step 02

    Design and quote

    A system sized to your use, with a clear price and expected savings.

  3. Step 03

    Subsidy and net meter

    We file the PM Surya Ghar application and the net meter request for you.

  4. Step 04

    Installation

    Our own team installs panels, structure, inverter, earthing and protection.

  5. Step 05

    Switch on

    Inspection, net meter fitted, and a walkthrough of the monitoring app.

  6. Step 06

    Looked after

    Cleaning advice, health checks and quick service from Colva.

Questions

Straight answers before you decide.

How much subsidy can I get for a home system?

Under the central PM Surya Ghar Muft Bijli Yojana, homes get ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, up to ₹78,000. It is paid into your bank account after the system is inspected.

Is there a Goa state subsidy as well?

Yes. From 1 April 2026 to 31 March 2028, the Goa government adds its own subsidy for grid connected rooftop systems, through GEDA, on top of the central amount. It is linked to the official benchmark cost and varies with system size. You need a permanent consumer account number with the Electricity Department. We work out the exact figure for your home and file both applications for you.

Does solar work in the Goa monsoon?

Yes, but output drops on heavy rain days. Over a full year the sunny months more than make up for it, which is why we size systems on yearly generation, not on a single month.

Can you install on a sloped tile roof?

Often, yes. We use mounting that clamps to the roof structure without breaking tiles, or an elevated frame on a nearby flat section. The site survey tells us what works for your house.

Will an on grid system run during a power cut?

No. For the safety of line workers, an on grid inverter shuts down when the grid is off. If you want backup during cuts, choose a hybrid system or keep your inverter and battery alongside.

How long does installation take?

Most home systems are installed in one to three days once materials are on site. The net meter and subsidy steps take longer and depend on the electricity department.

What maintenance does a rooftop system need?

Rinse the panels with plain water every few weeks in the dry season and keep shade off them. We offer health checks so you can see the system is producing what it should.

Free site survey

See exactly what your roof can do.

We visit, check the roof and shade, read your bills and send a clear proposal. No cost and no obligation, anywhere in Goa.